Member Plan Room

  

Newest plan uploads:
SAN LUIS OBISPO - ASPHALT OVERLAY 2010
New asphalt at various roads, preparing roadway surfaces by cleaning, repairing failed areas, removing portions of roadway surfaces, placing h ot mix asphalt for repairing & leveling, the roadbed, roadway grinding, adjusting monuments & utility covers, installing shoulder backing, construction pcc curb ramps and other detailed items.
Bids: 09/16 @ 3 PM


SAN LUIS OBISPO - LA LOMA ADOBE STABILIZATION
Structural stabilization, adobe brick wall repair & security barriers of La Loma Adobe.
Bids: 09/16 @ 3 PM - Job Walk: 09/09/10 @ 10 & 2 (M)



SANTA BARBARA - GREYHOUND LINES TERMINAL RELOCATION
soft demolition, asbestos/lead abatement, underground utilities sandblasting, masonry, precast stone, miscellaneous steel, rough, carpentry, finish carpentry, cabinetry, solid surface countertops, sheet metal roofing doors, hardware, windows, drywall, plaster, ceramic tile, marmoelum flooring, painting/staining, toilet accessories, HVAC, plumbin, fire sprinklers, electrical.
Bids: 09/21 @ 2 PM


VENTURA - PROMENADE REPAIR & MAINTENANCE
Removing & disposing of the xisting west-end concrete stairs installation of new timber access stairs, installation of additional rocks to further strengthen the rock revetment, repair & replacement of concrete slabs & parapet removal, improvement of electrical, componets along the promenad & various concrete crack & spall repairs.
Bids: 09/21 @ 4 PM - Job Walk: 09/08/10 @ 10 AM



PASO ROBLES - UPGRADE WATER LINES - SUNSET/PANORAMA
Mobilizing, preparing & implementing traffic control plans, construction, excavation, shoring & bracing, safetly dewatering, saw cutting, removal & disposal of portions of exsiting piplines, pipe embedment, pipe laying, connecting to existing facilities backfill & compaction, testing pavement replacement and ancilary work.
Bids: 09/23 @ 2 PM


SANTA BARBARA - CONSTRUCTION OF EL EMBARCADERO PHASE 1
Construction of a new tsorm drainage system & upgrading & reconfiguring an existing storm drain system. Re,oval & reconstruction of exsiting curb, gutter spandrel, cross gutter & sidewalks, installation of conduits, pull boxes, vaults & related items, necessary for the underground of the overhead utility lines, removal & reconstruction of roadway structural section, slurry,seal & plant pavement stripping & markings.
Bids: 09/23 @ 2 PM


SAN LUIS OBISPO - MARIA VISTA ESTATES PHASE 2
Earthwork, cleaning concrete swales & minor structures shall be installed, rock riprap aprons shall be placed, chain link fences & gates shall be installed.
Bids: 09/23 @ 3 PM


SOLVANG - SCADA SYSTEM DESIGN BUILD
Design & installation of a new operating system for SCADA system & transform the current communication protocol into a talk around/distributed system.
Bids: 09/23 @ 2 PM


OXNARD - OXNARD HS CULINARY ARTS CLASSROOMS RE-BID
Remodel & conversion of two home economic classrooms to kitchen style instructional classrooms & provision & installation of new walk-in freezer seismic upgrade.
Bids: 09/24 @ 1 PM - Job Walk: 09/07/10 @ 9 (M)



PORT HUENEME - HOME BLEACHER REPAIR PROJECT
Remove existing wood seat & foot planks & replace with new aluminum planks, misc, concrete work, painting, chain link fencing & steel work to repair the home side bleachers.
Bids: 09/21 @ 10 AM - Job Walk: 09/08/10 @ 11 (M)



PORT HUENEME - SENIOR LUNCH AREA PROJECT
Remove existing concrete paving, maonsry walls, trees & misc items to install new patio with concrete, pavers, seat walls, patio tables, new awning, entry feature & misc improvements.
Bids: 09/24 @ 2 PM - Job Walk: 09/08/10 @ 9 (M)



CAMARILLO - 2010 ANNUAL OVERLAY PROGRAM
Concrete, asphalt concrete, access ramp, traffic control, stripping, pavement, marking & related work.
Bids: 09/28 @ 10 AM


CAMARILLO - CANOPY INSTALLATION
Fabrication & installation of a sloped corrugated metal roof on the exsiting aggregated materials bins, including rain gutters & downspouts & concrete pad to connect to the existing v-ditch.
Bids: 09/28 @ 1:30 PM - Job Walk: 09/09/10 & 09/16/10 @ 1 PM



CAMARILLO - CORPORATION YARD SOLAR PANEL INSTALLATION
Furnishing & installing 8,850 sf of solar panels, installling system design, inverters, electrical wiring, conduit, trenching, structure penetration, sidewalk replacement & service panel connnection.
Bids: 09/28 @ 2 PM - Job Walk: 09/09/10 & 09/16/10 @ 1 PM



CAMARIILLO - ROOFING INSTALLATION
Removal & installation of approximately 9,200 sf of single-ply roofing material on two buildings, including membrane flashings, solar panel stanchions, rigid insulation, & crikets/nailers.
Bids: 09/28 @ 1 PM - Job Walk: 09/09/10 & 09/16/10 @ 1 PM



SANTA BARBARA - REMODEL 19 W. CARRILLO ST
Remodel of existing basement & two story offices.
Bids: 09/28 @ 3 PM


SANTA MARIA - WEST McCOY MEDIAN CONSTRUCTION
Consists of construction of a cobblestone concrete median & all work necessary to render the facility complete & operational.
Bids: 09/28 @ 2 PM


SOLEDAD - CONSTRUCTION OF WWTP ACCESS ROAD
Prepare & implement SWPPP, install construction area signs, excavate existing ground for the construction of new asphalt concrete access road, compaction & material testings, place AB class 2, place asphalt concrete pavement, place shoulder backing, adjust exsiting sewer manholes to grade, install traffic signs, place thermoplastic "STOP" legend & limit line & place fog seal coat.
Bids: 09/28 @ 2 PM - Job Walk: 09/14/10 @ 1:30 (M)



THOUSAND OAKS - PAVE. REHABILIATION LOCAL RDS.
Paving work, convertional & rubberized AC overlay, base repairs, berm repairs, grinding, PCC curb & gutter, sidewalk, root pruning, tree removals, pavement delineation & striping, survey monuments, & appurtenant work.
Bids: 09/28 @ 2 PM


UCSB - BIOLOGY II BOILER REPLACEMENT PROJECT BLDG 571
The removal of two existing stream boilers & installation of four new boilers with associated equipment & pipping along with controls.
Bids: 09/28 @ 2:30 PM - Job Walk: 09/14/10 @ 1:30 (M)



OXNARD - BARTOLO SQUARE NORTH NEIGHBORHOOD ST PHASE 2
Cold miling of existing aspahlt concrete pavement & overlay with ARHM & ARAM & slurry, concrete repairs & installation od ADA curb ramps, traffic signal modification; street name signs.
Bids: 09/29 @ 2 PM - Job Walk: 09/08/10 @ 10 AM



SANTA BARBARA - NEW CUYAMA RECREATION HALL RENOVATION
Renovating & correcting life safety & ADA issues for an appx. 5,000 SF exsiting recreation hall.
Bids: 09/30 @ 3 PM - Job Walk: 09/14/10 @ 1 (M)



SIMI VALLEY - ARROYO SIMI REPLANTING AT FIRST ST 2010
Removal of all irrigation systems appurtenances & vegetation/trees/roots. Filling & compacting resulting voids, restoring curb/gutter & asphalt pavement damaged during removal.
Bids: 09/05 @ 2 PM - Job Walk: 09/21/10 @ 10 AM



NEW = New projects booked since 08/30/10

Bids: - Job Walk: (M) = Mandatory



* = PLANS available on-line and at Cybercopy

Bids:


As of Wednesday, September 8th at 12 PM

Bids:





Bid Date Storage Plan Name Bid Date Addenda
Thursday Sept 9, 2010 [TT*] SAN LUIS OBISPO - PACHECO SCHOOL RAMP IMPROVEMENTS 09/09 @ 3 PM  
Friday Sept 10, 2010 [XX*] UCSB - HSSB TOWER & ARCADE PVC ROOF REPLACEMENT 09/10 @ 2:30 PM 1
Tuesday Sept 14, 2010 [13*] MOORPARK - REPAIR OF COLONIA DR STABILIZER 09/14 @ 2 PM 1
Tuesday Sept 14, 2010 [5*] MOORPARK - REPAIR OF ARROYO LAS POSAS EMBANKMENT AT MWTP 09/14 @ 10 AM 1
Tuesday Sept 14, 2010 [SS*] SANTA BARBARA - ARRA CATCH BASIN REPAIR PROJECT 09/14 @ 3 PM  
Tuesday Sept 14, 2010 [UU*] UCSB - SANTA CATALINA RESIDENCE HALL POOL RENOVATION PROJECT 09/14 @ 2:30 PM 2
Wednesday Sept 15, 2010 [14*] MOORPARK - REPAIR OF CONDOR STABILIZER 09/15 @ 2 PM  
Wednesday Sept 15, 2010 [AA*] SAN LUIS OBISPO - SEWERLINE REPLACEMENTS 2010-11 09/15 @ 3 PM  
Thursday Sept 16, 2010 [31*] MOORPARK - PAVEMENT REHABILITATION 09/16 @ 2 PM 2
Thursday Sept 16, 2010 [II*] SANTA CLARITA - OLD TOWN NEWHALL LIBRARY 09/16 @ 11 AM 2
Thursday Sept 16, 2010 [RR*] SAN LUIS OBISPO - ASPHALT OVERLAY 2010 09/16 @ 3 PM  
Thursday Sept 16, 2010 [QQ*] SAN LUIS OBISPO - LA LOMA ADOBE STABILIZATION 09/16 @ 3 PM  
Thursday Sept 16, 2010 [GG*] UCSB - BREN HALL LAB VENTILIATION BUILDING 521 09/16 @ 2:30 PM 2
Friday Sept 17, 2010 [ZZ*] SANTA MARIA - LAVIGNA II 09/17 @ 12 PM  
Friday Sept 17, 2010 [YY*] FOR INVITED SUB-CONTRACTORS ONLY- SANTA BARBARA - HOTEL MAR MONTE RENOVATION 09/17 @ 3 PM  
Monday Sept 20, 2010 [18] PORT HUENEME - CHANNEL ISLANDS BLVD BRIDGE RAIL REPAIR 09/20 @ 3 PM 1
Tuesday Sept 21, 2010 [NN* NEW] SANTA BARBARA - GREYHOUND LINES TERMINAL RELOCATION 09/21 @ 2 PM  
Tuesday Sept 21, 2010 [37* NEW] VENTURA - PROMENADE REPAIR & MAINTENANCE 09/21 @ 4 PM  
Wednesday Sept 22, 2010 [CC*] GOLETA - FAIRVIEW/BERKELEY TRAFFIC SIGNAL INSTALLATION 09/22 @ 2 PM  
Wednesday Sept 22, 2010 [16*] OXNARD - COLLEGE PARK IMPROVEMENTS PHASE 1C 09/22 @ 2 PM  
Thursday Sept 23, 2010 [JJ] GOLETA - LIBRARY ROOF REPLACEMENT 09/23 @ 10 AM  
Thursday Sept 23, 2010 [PP] PASO ROBLES - RETROFIT ORNAMENTAL LIGHT FIXTURES 09/23 @ 2 PM  
Thursday Sept 23, 2010 [EE*] PASO ROBLES - UPGRADE WATER LINES - SUNSET/PANORAMA 09/23 @ 2 PM  
Thursday Sept 23, 2010 [VV*] SANTA BARBARA - CONSTRUCTION OF EL EMBARCADERO PHASE 1 09/23 @ 2 PM 1
Thursday Sept 23, 2010 [FF*] SAN LUIS OBISPO - MARIA VISTA ESTATES PHASE 2 09/23 @ 3 PM 1
Thursday Sept 23, 2010 [KK] SOLVANG - SCADA SYSTEM DESIGN BUILD 09/23 @ 2 PM  
Friday Sept 24, 2010 [15*] OXNARD - OXNARD HS CULINARY ARTS CLASSROOMS RE-BID 09/24 @ 1 PM 3
Friday Sept 24, 2010 [38* NEW] PORT HUENEME - HOME BLEACHER REPAIR PROJECT 09/21 @ 10 AM  
Friday Sept 24, 2010 [24* NEW] PORT HUENEME - SENIOR LUNCH AREA PROJECT 09/24 @ 2 PM  
Tuesday Sept 28, 2010 [6* NEW] CAMARILLO - 2010 ANNUAL OVERLAY PROGRAM 09/28 @ 10 AM  
Tuesday Sept 28, 2010 [28* NEW] CAMARILLO - CANOPY INSTALLATION 09/28 @ 1:30 PM  
Tuesday Sept 28, 2010 [7* NEW] CAMARILLO - CORPORATION YARD SOLAR PANEL INSTALLATION 09/28 @ 2 PM  
Tuesday Sept 28, 2010 [8* NEW] CAMARIILLO - ROOFING INSTALLATION 09/28 @ 1 PM  
Tuesday Sept 28, 2010 [OO* NEW] SANTA BARBARA - REMODEL 19 W. CARRILLO ST 09/28 @ 3 PM  
Tuesday Sept 28, 2010 [BB* NEW] SANTA MARIA - WEST McCOY MEDIAN CONSTRUCTION 09/28 @ 2 PM  
Tuesday Sept 28, 2010 [Q* NEW] SOLEDAD - CONSTRUCTION OF WWTP ACCESS ROAD 09/28 @ 2 PM  
Tuesday Sept 28, 2010 [36*] THOUSAND OAKS - PAVE. REHABILIATION LOCAL RDS. 09/28 @ 2 PM 1
Tuesday Sept 28, 2010 [DD* NEW] UCSB - BIOLOGY II BOILER REPLACEMENT PROJECT BLDG 571 09/28 @ 2:30 PM  
Wednesday Sept 29, 2010 [9* NEW] OXNARD - BARTOLO SQUARE NORTH NEIGHBORHOOD ST PHASE 2 09/29 @ 2 PM  
Thursday Sept 30, 2010 [LL* NEW] SANTA BARBARA - NEW CUYAMA RECREATION HALL RENOVATION 09/30 @ 3 PM  
Tuesday Oct 5, 2010 [26* NEW] SIMI VALLEY - ARROYO SIMI REPLANTING AT FIRST ST 2010 09/05 @ 2 PM  
Documents NEW [*] NEW = New projects booked since 08/30/10  
* Digital On-LIne [*] * = PLANS available on-line and at Cybercopy  
Database Update [*] As of Wednesday, September 8th at 12 PM  

© Copyright Ventura County Contractors Association , 2004. All rights reserved
 
JavaScript Menu Courtesy of Milonic.com